Did I miss something here? To my understanding, all the RF stuff was built at the Vermont, ex-IBM fab and that has not changed - that fab is still running beyond capacity. The East Fishkill fab is used for advanced R&D on 22nm and 14nm tech nodes, but it is not cut out for production volumes. Fab 1 in Dresden will run the 22FDX node and that is solidified - and also that the 12FDX coming in later will be run in Fab 8 in Saratoga Springs NY. Can someone double check this information?
P.S. : I used to work at GF Fab 8 3 years ago and this is based on my best last understanding.
We’ve updated our terms. By continuing to use the site and/or by logging into your account, you agree to the Site’s updated Terms of Use and Privacy Policy.
2 Comments
Back to Article
Spatty - Thursday, September 27, 2018 - link
Is that like a 5-6" wafer in the image?MananDedhia - Friday, September 28, 2018 - link
Did I miss something here? To my understanding, all the RF stuff was built at the Vermont, ex-IBM fab and that has not changed - that fab is still running beyond capacity. The East Fishkill fab is used for advanced R&D on 22nm and 14nm tech nodes, but it is not cut out for production volumes. Fab 1 in Dresden will run the 22FDX node and that is solidified - and also that the 12FDX coming in later will be run in Fab 8 in Saratoga Springs NY. Can someone double check this information?P.S. : I used to work at GF Fab 8 3 years ago and this is based on my best last understanding.